Project Description: This project consists of the physical construction, management, and engineering of a new Airport Electrical Vault building and support infrastructure. The project has already been designed. The project includes primary and secondary power, water and sanitary service utilities, site access, parking, fencing, and grading per local and national building codes, rules, and regulations. In addition, the project includes the backup generator interior to the building, fuel tank (exterior to the building), and access.
Funding Source: 90% Florida Aviation Administration (FAA), 8% Florida Department of Transportation (FDOT), 2% Kissimmee Gateway Airport (ISM)